This article about NSW’s first cladding decision has been supplied by Bannermans Lawyers.
NSW’s First Cladding Decision
The recent Tribunal decision in SP92888 v Taylor Construction Group and Frasers Putney [2019] NSWCAT has held that combustible external cladding installed on residential buildings is a major defect for the purposes of statutory warranties under the Home Building Act 1989 (the HBA) and will have significant ramifications on owners of residential buildings wishing to explore cladding as a defect.
The Tribunal decision is analogous to and cites the Victorian decision in Owners Corporation No.1 of PS613436T v LU Simon Builders Pty Ltd (Building and Property) [2019] VCAT 2 286 which involved the fires in the Lacrosse Building.
GET NOTIFIED WHEN WE PUBLISH NEW Q&AS, NEWS AND ARTICLES TO THE SITE
Background
The Building Code of Australia (BCA) contains specifications that cladding cannot be combustible and be for the purpose for which they are intended.
Under section 6.30 the Environmental Planning and Assessment Act 1979, an interim occupation certificate cannot be issued unless the works the subject of the certificate are compliant with the BCA.
The building the subject of the dispute was classified as Type A under the BCA and is required to have non-combustible external walls. The BCA requires the attachments to the external wall do not adversely affect the fire resistance of the external wall.
The Owners Corporation allege a “Biowood” cladding which was installed on the external walls did not comply with the specifications of the BCA and was in breach of the statutory warranties.
Recent amendments to the BCA have also abolished exemptions which permitted certain types of combustible cladding. At the time of the issue of the occupation certificate, the Biowood panels was certified as BCA compliant because it passed an alternate test under AS 1530.3 for fire spread. However, both experts agreed the Biowood was combustible.
Contentions
The builder and developer were reluctant to acknowledge combustible cladding as a building defect, on the basis that at the time of approval, the relevant occupation certificates would have approved the use of the buildings as long as the preconditions to the certificates have been met.
The builder and developer argued the interim occupation certificate created irrefutable presumptions of law that the Biowood panels were suitable and that the Tribunal and the Owners Corporation were bound by the certificates.
The builder and developer also relied on competing expert evidence, which argued the Biowood cladding itself did not present an undue risk for fire spread because the heat produced from a burning panel was insufficient to set the other panels alight.
Decision
The Tribunal did not accept the argument it was bound by the presumptions made in the issue of the interim occupation certificate.
The Tribunal also found the panels posed significant risk to the building due to its combustibility, the rate of fire spread and other fire safety measures implemented in the building.
On this basis, the Tribunal found the Biowood panels did not meet the specified standards required under the BCA and was not fit for its intended purpose because it would decrease the fire resistance rating of the external walls of the building.
Therefore, the Tribunal found the builder and developer breached the statutory warranties at section 18B(1)(b) of the HBA.
Ramifications
The Tribunal adopted a “common sense” approach in considering the purpose and type of building when determining the use of the Biowood constituted breach of the statutory warranties.
The decision confirms that an individual assessment of whether the panel itself was compliant with the relevant codes and standards will not be a sufficient defence against proceedings for breach of statutory warranty, and the owners of similar buildings should be aware of their rights when dealing with builders and developers may deploy these excuses as defences.
Have a question about NSW’s first cladding decision or something to add to the article? Leave a comment below.
Read next:
- Managing the Cladding Crisis: aluminium composite panel (ACP)
- NSW: Q&A Obtaining Information About a Major Building Defect
Bannermans Lawyers
Telephone (02) 9929 0226
Suite 702, 2 Elizabeth Plaza
North Sydney NSW 2060
The information contained in this article is general information only and not legal advice. The currency, accuracy and completeness of this article (and its contents) should be checked by obtaining independent legal advice before you take any action or otherwise rely upon its contents in any way.
This post appears in Strata News #305.
This article has been republished with permission from the author and first appeared on the Bannermans Lawyers website.